We took a nice 30-person bus from Utrecht CS to the Paffendorf Castle, where we had lunch in the courtyard and a short tour of the visitor centre. Entire towns in the Rhein-Erft area have been rebuilt elsewhere and torn down to make room for the mines. The ground water is drained to avoid the pits from filling up, and ground water tables are affected up to the Dutch border. A substantial part of the local landscape was reclaimed with light woods and agriculture after the exhausted mine pits were filled in.
Then we visited the Garzweiler mine itself. It is hard to describe a 5x5 km hole in the ground. I expected it to look very sad. Instead it seemed at once sterile and like a corpse set upon by the occasional maggot, actually a 13000 tonne, 100 metre high excavator machine.
The strangest thing is that you hardly notice these huge mine pits until you get very close, because they go down into the landscape. Likewise, the giant machines are dwarfed by the landscape. Nevertheless, they dig up 1.5 metric tonnes of lignite per second, most of which is shipped to one of the four local power stations.
The scale of the Niederaussem plant was also impressive. We got a tour of the new BoA part of the plant with the experimental lignite drier, state of the art control room, steam turbines driving a 1 GW electric generator, and a look into the boiler. Their new cooling tower, the largest in the world, had a mild but distinctly noticeable breeze blowing into the bottom. The view on top of the 170 metre boiler house offered a nice view of Köln and Dusseldorf.
The new 43% efficient addition notwithstanding, the entire power plant is one of the worst CO2 emitters in Europe, with older parts working at efficiencies as low as 31%. This plant and the others in the area together produce 11 GigaWatts of electricity, and the cooling towers cause a warmer and wetter microclimate in the immediate area. But it is profitable without any subsidies (unlike hard coal mining elsewhere in Germany)...
Interestingly, there are many windmills and even a solar power testing facility in the area, but none of them are owned by RWE (the windmills are owned by farming cooperatives).
After our visits, we had a satisfying dinner in the sunshine at a nearby village and rode home.
I discussed the whole setup with my colleagues on the bus. On one hand, the local area is totally used to this, Germany needs the power, and they do reclaim the ground when they are done. On the other hand, they use 30GW or so of lignite, mess up the groundwater and emit staggering amounts of CO2.
RWE is working on an experimental carbon capture and storage (CCS) facility at the Niederraussem plant, but it will only capture a little bit of their emissions and will be used for two years of testing only. My colleagues have calculated that equipping a powdered coal plant with CCS will require so much power that efficiency will be reduced by 8%. It is inconceivable that RWE will agree to bear the cost of this. So even if regulations are put into place to make capture-ready plants actually capture some CO2, we can look forward to 20 years of lawsuits and lobbying for financial support and partial implementation and other delaying tactics.
It was a very nice day (kudos to the Ric, Martin and Deger who organised it) but in the grand scheme of things, what I saw did not make me very happy.